Scope
- Full civil works and utilities
- Municipal tie-ins, curb, gutter, sidewalk
- Asphalt roads and drainage systems
$9,200,000 program. Full civil and utilities with municipal tie-ins, curb, gutter, sidewalk, and asphalt roads.
CSC delivered the subdivision under a design/build model, coordinating entitlement, utilities, inspections, and phased civil work to accelerate lot releases.
A 16-lot subdivision in Midway, Utah, delivered through design/build. Scope included grading, underground utilities, stormwater conveyance and retention, roadway section, curb and gutter, sidewalks, and municipal tie-ins. CSC managed schedule, budget, and QA/QC through turnover.